MicroTech’s state-of-the-art certified manufacturing facility provides precision manufacturing and supply chain innovation through capability and tooling for small metal and plastic components for the most demanding industries.
As part of the company’s desire for new-world technology and a “forward-thinking manufacturing” approach, MicroTech wanted to “go-solar” to supplement the power requirements at its manufacturing
facility.
They called on EPC Contractor, Energías Limpias de Centroamerica (ELCA) to install 1,432 solar panels for its 531 Kw DC system on the facility’s standing seam metal roof.